国产成人亚洲综合网站小说,日本不卡在线视频二区三区,国产中文制服丝袜另类,欧美成人午夜视频免看,久久国产精品国产精品日韩区 ,中文字幕第1页中文字幕在,97国内精品久久久久不卡,91麻豆国产精品91久久久
        Welcome to Jiangsu Tianling Instrument Co., Ltd.
        Chinese English Service hotline:189-2189-9789
        Products
        當前位置:Home>>News>>Technical
        分享至:

        Maintenance of vacuum pump of vacuum drying oven
        Issue date:2022/03/08    Views:22    Classification:Technical

        1. Generally, the vacuum pump should be overhauled after 2000 hours of operation, check the aging degree of the rubber seal, check whether the exhaust valve disc is cracked, and clean up the dirt deposited on the valve disc and exhaust valve seat. Clean the parts in the whole vacuum pump cavity, such as rotors, rotating blades, springs, etc. It is usually washed with gasoline and dried. After cleaning the rubber parts, dry them with a dry cloth. When cleaning and assembling, handle with care to avoid bumping.


        2. Start the motor. When the vacuum pump operates normally, turn on the outlet pressure gauge and the inlet vacuum pump. After it shows appropriate pressure, gradually open the gate valve and check the motor load at the same time.


        3. Check the oil level frequently. If it does not meet the requirements, adjust it to meet the requirements. When the vacuum pump is running, the oil level shall be subject to the center of the oil standard.


        4. Check the oil quality frequently. If the oil is deteriorated, replace it with new oil in time to ensure that the vacuum pump works normally.


        5. When the vacuum pump is to be stopped, close the gate valve and pressure gauge first, and then stop the motor.


        6. After reassembly, the test run should be carried out. Generally, it should be operated in an empty state for 2 hours and the oil should be changed twice. Because a certain amount of volatile substances will be left in the vacuum pump during cleaning, it can be put into normal operation after normal operation.


        7. The oil change period shall be considered according to the actual service conditions and whether it can meet the performance requirements, and shall be decided by the user at his discretion. Generally, when a new vacuum pump is used to pump clean and dry gas, it is recommended to change the oil once every 100 hours. When ferrous metal powder is not visible in the oil, the oil change period can be appropriately extended in the future.


        8. Add bearing lubricating oil into the bearing body, observe that the oil level should be at the center line of the oil standard, and the lubricating oil should be replaced or supplemented in time.


        9. Adjust the packing gland frequently to ensure that the leakage in the packing chamber is normal (it is appropriate to leak in drops).


        10. Jog the motor to see if the motor turns correctly.


        11. Try to control the flow and head of the vacuum pump within the range indicated on the label to ensure that the vacuum pump operates at the efficiency point, so as to obtain the energy-saving effect.


        12. Unscrew the water diversion plug of the vacuum pump body and fill the water diversion (or slurry diversion).


        13. If the vacuum pump is found to have abnormal sound, stop immediately to check the cause.


        14. During the operation of the vacuum pump, the bearing temperature shall not exceed the ambient temperature of 35C and the temperature shall not exceed 80C.


        15. Check whether the vacuum pump pipeline and joint are loose. Turn the vacuum pump by hand to see if it is flexible.


        16. The lubricating oil of the vacuum pump shall be changed every 100 hours within the working month, and then every 500 hours.


        17. Clean the pipe if possible to ensure that the pipeline is unblocked.


        18. Regularly check the wear of the shaft sleeve, and replace it in time after the wear is large.


        19. Close the gate valve, outlet pressure gauge and inlet vacuum gauge of the water outlet pipeline.


        20. If the vacuum pump is out of service for a long time, it is necessary to disassemble the pump completely, wipe the moisture, coat the rotating parts and joints with grease, install them, and keep them properly.


        21. When the vacuum pump is used in cold winter, after stopping, unscrew the drain plug at the lower part of the pump body to drain the media. Prevent frost cracking.


        National free consultation hotline:400-928-3898

        Mailbox:jstenlin17@163.com

        Address: No. 4, Zhonglian Road, Baocai Industrial Park,
        Yandu District, Yancheng City.

        CopyRight ? 2022 Jiangsu Tianling Instrument Co., Ltd. copyright   Su ICP Bei 17018543-1
        主站蜘蛛池模板: 成人爱爱视频在线观看| 昭觉县| 激情视频在线观看国产中文| 桃园市| 中文字幕人妻丝袜诱惑| 久久人妻av无码中文专区| 一级无码啪啪| 安达市| 欧美日本视频一区| 毛片av在线播放亚洲av网站| 2021精品综合久久久久| 久久青草亚洲AV无码麻豆| 国产呦系列视频网站在线观看| 亚洲av日韩精品一区二区不卡| 97无码人妻一区二区三区蜜臀| 精品视频在线观看一区二区有| 乐陵市| 曲阜市| 镇远县| 甘肃省| 谢通门县| 粉嫩高中生无码视频在线观看| 成人国产乱对白在线观看| 日本特黄a级高清免费大片| 色婷婷久久免费网站| 99riav精品国产| 精品人妻中文字幕一区二区三区| 亚洲AV无码一区二区三区精神| 国产精品亚洲ΑV天堂无码| 清水河县| 杭锦后旗| 久久综合给合久久97色| 午夜日韩成年人视频在线观看| 国产粉嫩美女一区二区三 | 精品亚洲女同一区二区| 91精品国产91热久久p| 一本色道久久综合中文字幕| 亚洲AⅤ乱码一区二区三区| 国产伦一区二区三区精品| 国产精品无码久久久久久蜜臀AV | 亚洲红杏AV无码专区首页|